Skip To Content
AER-4058 Project and Drawing Review is a Course

AER-4058 Project and Drawing Review

Self-paced

$10 Enroll

Full course description

Course Description

Properly installing wire bundles in an airplane requires careful planning. Comparing the area of the installation to the production illustration is an important step in the planning process.

By the end of this course, you will be able to

• Understand the use of a stand-off

• Identify an attach point bubble on the production illustration

• Use the attach point reference table to identify drawings associated with attach points

• Recognize that a production illustration may represent the completion of several installation plans

Estimated completion time (hours): 0.8